From the end of the 60s of the last century, when the application and production of windows, doors and facade elements from aluminum profiles began, until today, when these elements are mostly made of aluminum, the design and technical performance of these products have followed contemporary architectural trends.

When designing the profile system for architectural application, we made sure that the technical and aesthetic performance was in accordance with the current highest standards.

In addition, being aware of the fact that no system can be so diverse and designed in such a way that it can anticipate all the ideas of contemporary architecture, and using the experience of over 35 years of work in this field, our team of engineers offers a quick and efficient adaptation of the existing systems to any idea.

If there is a need, we can develop a complete system for part of the project or the entire project.

Let’s highlight some of the projects done in this way:

  • “Official gazette” building, in Belgrade, (replacement of the old facade in 1997) - for the first time in this area, element facade was produced and assembled. The specificity of the request was to replace the facade without a single day of work interruption.
  • AIRPORT CITY – several buildings from 2004-2022. For the first time in this area, the assembly of the element facade began after the partial completion of the concrete skeleton.
  • BUSINESS GARDEN – a completely new element facade system designed, according to the author's idea.
  • MONA PLAZA HOTEL – used the facade system from the Business garden project. The specificity is the application of "laminam" plates d=5mm in non-transparent parts without visible holders, as well as the external Brise soleil (decorative elements and lighting support).

An invisible substructure system has been developed for the windy facade, with a final covering of laminate panels measuring up to 1.5 x 3.0 m.

  • Project FIAT Kragujevac – we developed an economic system of industrial windows for external installation in parallel with the installation of "Trimo" panels.

The system included one window = one panel with a length of 6.0 m. Prefabricated window arrays with infill (modules up to 6.0 m long) were mounted identically and parallel to the facade panels.

About 4,000 such windows were installed in this way, with the hiring of only 4 assembly workers and a crane that was simultaneously used for panel mounting.

  • Sports complex Kosutnjak - Designed and executed a new system of classic hanging facade according to the idea of the designer, in cooperation with the company New Quest.